With an extended Authorized promoter portfolio, structural cabling is carried out by taking into consideration all technical details required by end user. Involving in each phase of the work, expert team chief engineers evaluate the quality of the work and give approval, and plan the ending date of work. Cabling is completed by checking that the cables being implemented do not exceed ninety meters.
Patch Panel and Outlet Montage
After the implementation of cables, the cable ends, which are brought together, are gathered together in a Cabinet Patch Panel having an appropriate height and width. Each cable end - without missing any technical detail- is terminated by fitting its end in Patch Panel according to the category of the cable being used. And the other ends of the cables are ended in a data outlet near to desks where user computers are located. Thus, the process is completed and all of the ends of a line are terminated. Again in respect to keystonejack terminations used in data outlets, termination techniques are used according to the category of the cable being used, and they are enabled to work with cable compatibly.
Test and Labeling
A very keen study is carried out in the phase of Test and Labeling which constitutes the last phase of structural cabling. First of all, each line is coded and labeled in accordance with customer demands. Testing is done by selecting the most appropriate test program with highly developed test measurement devices, defective terminations or cable disconnections are determined and right after the required adjustments are done, these defective terminations are put through a second test. This process goes on until the tests of all of the ends give positive results. Test results are computerized, and then delivered to the customer preferably on a Cd or as a written copy.
Certification
Following the cabling projects carried out in accordance with all technical details of Structural Cabling, data are gathered together in producing company. These data- test results, several photos taken in the cabinet and system room and along with information related to Customer and Founder Firm - are sent abroad to the producing factory. Following the required examination, among those which are approved, “15 years System Performance Guarantee” is issued for Category 5 systems and “Lifetime System Performance Guarantee” certificate for Category 6 systems. This certificate of guarantee is delivered to the customer by our Authorized Founder Firm. The systems possessing this certificate are technologically guaranteed producing firm as well.